• ☆ Yσɠƚԋσʂ ☆@lemmy.mlOP
      link
      fedilink
      arrow-up
      15
      ·
      1 month ago

      That’s also very possible. The US grid has very little spare capacity, and building out more will be a decades long project. So, if their newer models are more power hungry, then they might not be economically viable even with all the investor money being thrown at them.

      • PriorityMotif@lemmy.world
        link
        fedilink
        arrow-up
        7
        arrow-down
        1
        ·
        1 month ago

        I expect more power efficient chips that are ai specific to come out in the next few years. Eventually you’ll be able to run good models on your phone. Not sure about ram requirements or anything like that if the model could be shrunk down somehow. There’s definitely huge gains in optimizing efficiency to be had. Right now is the equivalent of an old IBM mainframe trying to do a spreadsheet. We might even giggle at the thought of gigabytes of ram in the future with having multiple terabytes as standard on personal devices.

        • ☆ Yσɠƚԋσʂ ☆@lemmy.mlOP
          link
          fedilink
          arrow-up
          11
          ·
          1 month ago

          I expect we’ll start seeing stuff like Taalas where they print the model to the chip and other specialized chips like Xuantie C950 going forward. Neither of these requires DRAM, and Taalas is particularly clever since they just print the model right to an ASIC chip. So, the whole renting out LLMs business model isn’t going to last long I suspect.

          • MalReynolds@slrpnk.net
            link
            fedilink
            English
            arrow-up
            5
            ·
            1 month ago

            So a repeat of the crypto crash for graphics cards when ASICs ate their lunch. Mind you, that’s only for inference (although a super fast QWEN 3.8 would meet a lot of peoples needs).

            The argument for datacentres is for training the models, but then they’ll need to prove that they haven’t hit a diminishing returns wall, which will be hard if, as seems likely, they have. Also the Chinese have been doing it in a cave, with a box of scraps (figuratively), and gotten at least 90+% as good results.

            Seems like the recent advances have been in the frameworks, which don’t need no stinking (literally if fossil fueled) datacentres.

            • ☆ Yσɠƚԋσʂ ☆@lemmy.mlOP
              link
              fedilink
              arrow-up
              1
              ·
              1 month ago

              Right, I’d argue that China proves you don’t need massive data centers for training. And yeah, I think something like Qwen 3.8 is more than enough for tasks most people do. There are a lot of tricks you can do as well with the harness, where there’s a lot of attention is shifting now. And it’s a lot cheaper and faster to develop better harnesses than train new models. I expect we’ll start seeing a shift towards neurosymbolic systems before long where the LLM acts as a stochastic component within a symbolic logic engine.

    • reallykindasorta@slrpnk.net
      link
      fedilink
      arrow-up
      3
      ·
      1 month ago

      If so it amuses me that investing in maintaining and upgrading public infrastructure via taxes might have saved them the choke point

      • emergencyfood@sh.itjust.works
        link
        fedilink
        arrow-up
        2
        ·
        1 month ago

        Not even the first time this is happening. The US & Co. are concerned about being technologically overtaken by Japan / China, but don’t make their universities affordable.

    • historicaldocuments@lemmy.world
      link
      fedilink
      arrow-up
      2
      ·
      1 month ago

      Musk: Yes, we should all slow down. With no external verification and upon the agreement of this handshake, we should all stop developing so fast. We, especially, will slow down. You can trust us.

      Actually, what does that look like? I assumed from the expansions the bottleneck wasn’t algorithmic, i.e. each data center that they bring online was designed from the ground up to be at 100% all the time. Is that not the case? Can you even (for lack of a better metaphor) underclock your datacenter? Does the cooling work that way?

      For that matter, are they doing that trick where the datacenter is owned/operated by Independent DC Company X, and has exclusive lease agreements for compute?

      • emergencyfood@sh.itjust.works
        link
        fedilink
        arrow-up
        1
        ·
        1 month ago

        I’m guessing they’ll stop funding / building new data centres? Not all the ones announced have been built, and not all those built are operational.